Project Experience
Aggregate, construction material, coal, concentrate, forestry, pipeline, and mine support hauling experience across BC and Yukon.
Coal Mining Operations — 2018–2023
Hauled coal from active mining operations to ROM rail load-out facilities throughout Chetwynd and Tumbler Ridge, supporting Brule, Willow Creek, Quintette, Wolverine, and PRC operations.
Equipment: Up to 12 truck and trailer combinations, including Tri-Drive dumps, Tri-Axle pups, and quad wagon configurations.
Artemis Blackwater Mine
Hauled construction aggregates from Prince George to the Artemis Blackwater Mine during Phase 1 construction.
Equipment: 9 truck and trailer units in 7-axle and 8-axle configurations.
Coastal GasLink Pipeline
Hauled limestone from the Mackenzie, BC region to support Coastal GasLink pipeline construction near Mackenzie and McLeod Lake.
Equipment: 3 Tri-Drive dump trucks with Tri-Axle pup trailers.
Red Chris Mine
Hauled sand and gravel from Watson Lake, Yukon to Red Chris Mine, and hauled copper concentrate from Red Chris Mine to Stewart, BC port facilities.
Eskay Creek / KSM Corridor
Hauled sand and gravel from the 43 km pit to the KSM project area using Tri-Drive dump trucks with Tri-Axle pup trailer configurations.
Forestry & Industrial
Hauled rip rap and aggregate materials from Prince George area pits to various Canfor lumber mill operations and forestry job sites.
Highway 97C — Williams Lake
Hauled road grindings and asphalt materials for resurfacing work on Highway 97C in the Williams Lake region.
Yukon to Stewart Port
Hauled copper concentrate from Whitehorse, Yukon to Stewart, BC port facilities using 8-axle Super B side dump configurations.
Project Gallery






