Established 2018  ·  Chetwynd, BC

Northern BC’s
Sand and Gravel Hauling
Specialists

Tri-Drive dump trucks and pup trailers serving mining, infrastructure, and road construction across Northwest BC. Remote terrain. Steep grades. On schedule.

7+Years Operating
9+Major Projects
4BC Regions Served
24/7Project Availability
Projects Include: ESKAY CREEK MINE  ·  KSM PROJECT  ·  ARTEMIS GOLD  ·  TRANS MOUNTAIN PIPELINE  ·  TNDC
What We Haul

Aggregate Hauling Services

High-payload hauling for the materials that keep Northern BC projects moving — delivered safely and on schedule.

Sand and gravel hauling Northern BC
Service 01

Sand & Gravel Hauling

Bulk transportation of construction sand, pit run gravel, and road base for road building, site prep, and civil construction projects throughout Northern BC.

Learn more →
Crushed aggregate hauling BC
Service 02

Crushed Aggregate & Rip Rap

Crushed aggregate, structural fill, rip rap, and road base for mine site construction, bridge approaches, embankments, and erosion control.

Learn more →
Mine and industrial material hauling
Service 03

Mine & Industrial Materials

Coal, ore, concentrate, and mine support materials. Experienced on remote access roads, steep grades, and the challenging terrain of BC’s major mine projects.

Learn more →
Pipeline corridor hauling BC
Service 04

Pipeline Projects

Sand and gravel transportation for pipeline projects in BC and resource corridor construction. Proven on Coastal GasLink and Trans Mountain Pipeline projects.

Learn more →
Proven Track Record

Project Experience

9+ completed projects across Northern BC and Yukon — mining, pipeline, and civil infrastructure. Real work. Real results.

Project Location Scope of Work Type
Conuma Coal Operations
2018–2024
Chetwynd & Tumbler Ridge, BC Coal hauling from Brule, Willow Creek, Wolverine, Quintette & PRC Mines to rail load-out. Up to 12 truck & trailer combinations. Mining
Artemis Gold — Blackwater Mine
2023
Central BC Hauled construction aggregates from Prince George area suppliers to Blackwater Mine. Multi-truck Phase 1 mine construction support. Mining
Trans Mountain Expansion
2021–2022
British Columbia Aggregate and construction material hauling supporting pipeline construction activities across BC corridor spreads. Pipeline
Coastal GasLink Pipeline
2023
Mackenzie / McLeod Lake, BC Hauled limestone and construction materials supporting pipeline construction. Tri-Drive and Tri-Axle Pup trailer configurations. Pipeline
Red Chris Mine
2024–2026
Northwest BC Sand & gravel hauling into site. Copper concentrate hauling from Red Chris Mine to Stewart Port. Remote resource road operations. Mining
Eskay Creek Project Corridor
2024–2025
Golden Triangle, BC Aggregate and construction material hauling supporting mine development and infrastructure. Highway 37 corridor operations. Mining
KSM Project Corridor
2024–2025
Golden Triangle, BC Aggregate hauling and mine support transportation on remote mountain access and resource roads. Tri-Drive and Pup trailer operations. Mining
Yukon Copper Concentrate
2024
Yukon to Stewart Port, BC Long-haul copper concentrate transportation. Cross-jurisdiction resource logistics between Yukon and BC Stewart Port. Concentrate
Highway & Civil Infrastructure
2019
BC Interior Road grinding haulage, asphalt material transport, highway resurfacing support. Includes Highway 97 corridor and civil construction aggregate hauling. Infrastructure
Insta Trucking Ltd fleet of Tri-Drive dump trucks Northern BC
Why Contractors Choose Us

For Northern BC Projects

Dependable performance built on years of real project experience in conditions most operators won’t take on.

01

Remote Terrain Experience

Proven on remote mine roads, steep mountain grades, and challenging access conditions across the Golden Triangle, Peace Region, and Northwest BC — since 2018.

02

Community & Indigenous Partnerships

We value strong relationships with Indigenous business partners and community stakeholders throughout Northwest British Columbia, supporting economic participation and long-term project opportunities.

03

Safety-First Operations

Rigorous equipment maintenance, trained drivers, and safe operating practices on every job site. WCB BC compliant and fully insured. Clearance letters available on request.

04

Northern BC

Operating out of Chetwynd and Telegraph Creek, BC — we know the roads, the seasons, and the conditions. Local knowledge across Northern BC translates directly to better performance on your project.

Where We Work

Operating Across Northern BC

From the Peace Region to the Stikine — experienced in the terrain, roads, and conditions that define Northern BC resource projects.

Stikine Region

  • Telegraph Creek
  • Dease Lake
  • Iskut
  • Golden Triangle

Northwest BC

  • Kitimat
  • Terrace
  • Prince Rupert
  • Smithers

Peace Region

  • Chetwynd
  • Tumbler Ridge
  • Dawson Creek
  • Fort St. John

Cariboo & Central Interior

  • Prince George
  • Quesnel
  • Williams Lake
  • Blackwater
Fleet & Equipment

Truck & Trailer Configurations

Tri-Drive dump truck Northern BC
4 Axle 18 Tonne

Tri-Drive Dump Truck

Tri-Drive with Tri-Axle Pup Trailer
7 Axle 31 Tonne

Tri-Drive + Tri-Axle Pup Trailer

Tri-Drive with Quad Wagon
8 Axle 40 Tonne

Tri-Drive + Quad Wagon

Tandem with Super B Side Dump
8 Axle 40 Tonne

Tandem + Super B Side Dump

Get In Touch

Ready to Discuss Your Project?

Contact us directly to discuss your project requirements.